Protechtiv > Services > Design and Build of a Clean Room

Site Design and Build Projects Manager of a Clean Rooms:

Our role is to manage the design and build of clean rooms, including validation activities management (performed by an external contractor).

The design stage included, examination of the equipment and the utilities required for the clean room, understanding the user’s needs, established project budget, and bid management.

After bid, managed the contractor’s selection and the construction process.

Before handover to the end-user, performed the commissioning and validation activities for the equipment, HVAC system and clean rooms

If You Need Any Solution We Are Available For You

Contact Us

Warning: PHP Startup: Unable to load dynamic library 'mbstring.so' (tried: /usr/local/lib/php/extensions/no-debug-non-zts-20230831/mbstring.so (/usr/local/lib/php/extensions/no-debug-non-zts-20230831/mbstring.so: cannot open shared object file: No such file or directory), /usr/local/lib/php/extensions/no-debug-non-zts-20230831/mbstring.so.so (/usr/local/lib/php/extensions/no-debug-non-zts-20230831/mbstring.so.so: cannot open shared object file: No such file or directory)) in Unknown on line 0

Warning: Version warning: Imagick was compiled against ImageMagick version 1692 but version 1693 is loaded. Imagick will run but may behave surprisingly in Unknown on line 0